Full-Scale In-Situ Thermal Desorption of Hydrocarbon Contamination at the Ford Aquitaine Industry Site in Blanquefort, France

A 1,260 m³ full-scale remediation used 48 heating wells to treat HCOV trapped in a floating mineral-oil layer, with vapour condensation and activated-carbon treatment, achieving the remediation objectives after five weeks of heating.

Full-Scale In-Situ Thermal Desorption at the Ford Aquitaine Site in Blanquefort

SITE DESCRIPTION

       Treated Volume

  1,260 m³ of contaminated soil (2,268 T)

          Thermal technology

   In-Situ Treatment (ISTD, full scale) 

       Main contaminant

Hydrocarbons (HCOV), including perchloroethylene

        Site challenges

Hydrocarbons trapped in a mineral oil layer floating on groundwater, over a 280 m² area at 4.5 m depth

        Project Timeline

2011



Full-scale thermal remediation site at the Ford Aquitaine Industry plant in Blanquefort

SOLUTION

          Treatment Method

Full-scale In-Situ Thermal Desorption following a successful pilot test

          Treatment program

48 heating wells connected to 24 gas-fuelled burners

         Contaminated Vapors Management

Condensation and cooling, then activated carbon treatment

       Process control

5 weeks of treatment · continuous monitoring of temperature, air quality and gas emissions


Heating well installation recovering trapped hydrocarbons in Blanquefort, France

RESULTS

✅         1,260 m³ of contaminated soil treated (full scale).

✅          Remediation objectives achieved for hydrocarbons trapped in the floating oil layer

✅         Project delivered for Ford Aquitaine Industry with consultant APAVE





Monitoring equipment on the Ford Aquitaine remediation site in Blanquefort