SITE DESCRIPTION
Treated Volume | 800 m³ of contaminated soil (1,440 T) |
Thermal technology | In-Situ Treatment (ISTD) |
Main contaminant | Hydrocarbons (mineral oils, TPH) |
Site challenges | Floating oil layer requiring 45-90 days of heating; treatment duration extended by rainwater infiltration in the treatment zone |
Project Timeline | 2013 |

SOLUTION
Treatment Method |
In-Situ Thermal Desorption with coaxial heating tubes |
Treatment program | 13 heating wells, target temperature 200°C (or 100°C over 2 weeks) |
Contaminated Vapors Management | Not specified in source document |
Process control | 32 thermocouples · monitoring of standard emissions parameters (CO, CxHy, CO2, O2, NOx) |

RESULTS
✅ 80,000 m³ of contaminated soil treated. |
✅ Floating oil layer eliminated after 55 days of heating; concentration reduced from 14,000 mg/kg to below the 300 mg/kg target |
✅ Treatment objectives reached for Derbigum (Imperbel), with consultant Ibeve, despite rainwater infiltration |