SITE DESCRIPTION
Treated Volume | 120 m² of contaminated soil, treated to a depth of 4.5 m (~540 m³) |
Thermal technology | In-Situ Thermal Desorption (ISTD) |
Main contaminant | TPH C10–C40 (up to 40,000 mg/kg dm), LNAPL present |
Site challenges | Treatment beneath/around a cement rainwater pipe; groundwater at 4–4.5 m depth; 65 cm thick LNAPL layer |
Project Timeline | 2012 |

SOLUTION
Treatment Method | In-Situ Thermal Desorption (ISTD), selected to preserve the cement rainwater pipe |
Treatment program | 169 heating tubes, target temperature 100°C, 55 days of heating |
Contaminated Vapors Management | Gas composition monitored for CO, CxHy, CO₂, O₂ and NOx |
Process control |
Temperature monitoring with 16 thermocouples; treatment duration: 8 weeks
|

RESULTS
✅ 120 m² of contaminated soil treated to a depth of 4.5 m. |
✅ After 55 days of heating, the free-phase LNAPL (floating oil layer) was eliminated. |
✅ Treatment completed over an 8-week period, with continuous temperature and gas monitoring |
Reference sheet PDF: to be attached (not yet available on this draft).