SITE DESCRIPTION
Treated Volume | 3,000 m³ of contaminated soil (5,400 T) |
Thermal technology | In-situ thermal treatment using the Thermopile process |
Main contaminant | TPH / mineral oil, up to 37,000 mg/kg |
Site challenges | Contamination beneath an underground station, metro depot and bus depot; further excavation prohibited due to building stability constraints |
Project Timeline | 2005 |

SOLUTION
Treatment Method | In-situ thermal treatment selected to remediate contaminated soil that could no longer be excavated due to structural stability constraints |
Treatment program | Treatment performed in situ following removal of the leaking tanks and excavation to a maximum depth of 6 m |
Contaminated Vapors Management | Desorbed gases collected and routed through a gas-treatment system before release |
Process control |
Thermal treatment and off-gas treatment integrated in the on-site Thermopile system
|

RESULTS
✅ 3,000 m³ (5,400 T) of TPH-contaminated soil treated in situ. |
✅ Decontamination objective successfully achieved despite major structural constraints. |
✅ Mineral oil concentrations reduced from up to 37,000 mg/kg to the required clean-up level. |