In-Situ Thermopile Treatment of TPH-Contaminated Soil Beneath the DELTA Transport Site in Brussels, Belgium

Around 3,000 m³ of soil contaminated by leaking underground fuel tanks was treated in situ after further excavation became impossible due to building stability constraints, reducing mineral oil concentrations from up to 37,000 mg/kg and achieving the remediation objectives.

In-Situ Thermopile Treatment of TPH-Contaminated Soil at the DELTA Transport Site in Brussels

SITE DESCRIPTION

       Treated Volume

   3,000 m³ of contaminated soil (5,400 T)

          Thermal technology

    In-situ thermal treatment using the Thermopile process

       Main contaminant

TPH / mineral oil, up to 37,000 mg/kg

        Site challenges

  Contamination beneath an underground station, metro depot and bus depot; further excavation prohibited due to building stability constraints

        Project Timeline

2005



Thermopile installation at the DELTA Transport metro depot in Brussels

SOLUTION

          Treatment Method

  In-situ thermal treatment selected to remediate contaminated soil that could no longer be excavated due to structural stability constraints

          Treatment program

Treatment performed in situ following removal of the leaking tanks and excavation to a maximum depth of 6 m

         Contaminated Vapors Management

Desorbed gases collected and routed through a gas-treatment system before release

       Process control

Thermal treatment and off-gas treatment integrated in the on-site Thermopile system  


Thermopile equipment treating TPH and mineral oil contamination in Brussels

RESULTS

✅           3,000 m³ (5,400 T) of TPH-contaminated soil treated in situ.

✅           Decontamination objective successfully achieved despite major structural constraints.

✅           Mineral oil concentrations reduced from up to 37,000 mg/kg to the required clean-up level.





Monitoring the in-situ Thermopile program at the DELTA Transport site