BONHEIDEN – BELGIUM
Context & Project Description
The site is a disaffected building which faith is to be rebuild for housing and is contaminated with chlorinated solvent. The contamination has been emitted by an aluminum refining process. The site is composed of two distinct rooms for a total of 60m². A 2m soil layer has been excavated from one of the rooms and then has been backfilled with sand cement/concrete. Even there’s a 2m layer of clean soil, for such shallow depth, the heat has to start from 0m. therefore, the parameters are the same in both rooms (i.e. from 0 to 4m).
The treatment objective is to reach less than 1ppm of chlorinated solvent in the soil. To do so, the temperature of the soil has to reach 100°C.
Equipment
32 Gas Smart Burners working with propane gas and an activated carbon tank
Treatment target
95°C in the soil and less than 1ppm
Monitoring
- 6 temperature probe wells at cold points (at depths 2m and 4m)
- 3 pressure points
- Gas reading at the vent for exhaust gases
Planning
January to June 2022
Conclusion
The thermal treatment was a success. The project ends up after 25 days of heating and the target of 1ppm was reached in the whole.
Emission standards were respected throughout the treatment.
Key Data
Contaminant
TCE (trichloethylene)
Max. Concentration
Max : 23 000 mg/kg-drysoil
Average: 200 mg/kg-drysoil
Volume
250m³
Tonnage
425 Tons
Nb of Heating Tubes (in total)
32 heating tubes
Temperature Target
95°C for 5 days
Project Duration
25 days
Treatment Targets
Less than 1ppm
Location
Bonheiden, Belgium
Client
OVAM
Partner
Verhoeve
Consultant
Van Vooren
Date
2022