Context & Project Description
The whole Noroxo site covered about 34 hectares. It was located between a commercial area and an agricultural area. In order to build the stockpiles (ESTD), 7.566 m² located at the extreme North West of the site were allocated for the thermal treatment.
As the site contained explosive ordnance from WW1, a UXO clearance was performed prior and during all excavation works. Residual explosives were treated with the soil (ESTD) after ordnance removal.
The main issue with high concentrated spots on a large area is the difficulty to treat all the spots onsite, and therefore an Ex-Situ Thermal Desorption (ESTD) was selected by the client. Soils with hydrocarbons concentrations higher than the remediation target were excavated and stored in a single location and eventually erected in several polluted soil piles. The treatment area as chosen to be able to run 2 piles simultaneously, with a third one in mobilization/demobilization.
Conclusion
The project was achieved after 9 months of treatment. All the improvements applied from Pile 3 and the weather led to a decrease of the treatment time from 53 days to 39 days. Each batch was accepted and validated by the client which means than HT remediated about 12.000 m3 of polluted soil.
Emission standards were respected throughout the treatment. The demobilization was achieved in 1,5 months and almost all the equipments were brought back to Brussels to be reused in future projects.
Key Data
Contaminants
C5-C40, BTEX, HAP
TNT/DNT/NG
Max. Concentration
C5-C40: 4145.5 mg/kg DM
BTEX: 1.16 mg/kg DM
HAP: 30.3 mg/kg DM
Explosives: Treatment after UXO screenings
Volume
12000 m³
Tonnage
21000 Tons
Nb of Heating Tubes
75
Temperature Target
150-200°C
Project Duration
39-52 days per batch
Treatment Targets
C5-C40: <2000 mg/kg (silt)
<1000 mg/kg (backfill)
BTEX: <1.5 mg/kg (benzene)
<5 mg/kg (toluene)
<10 mg/kg (ethylbenzene)
<40 mg/kg (xylene)
HAP: <50 mg/kg
Expl: Non detect
Location
Harnes – France
Future Use
Commercial and Leisure
Client
Exxon Mobil
Partner
Séché EcoService
Consultant
Golder Associates
Date
2019