Context

During the demolition works of the Eternit factory at Vitry-in-Charollais (71), DG Construction was charged to find efficient solutions to treat the TPH polluted soils found on the site. DG Construction excavated, sorted and handled the polluted material. The depollution was carried out by Deep Green.

Equipment

The project was carried out using a cold configuration DRAGON 35 unit. The duration was a competitive a vantage. So, the project was achieved in two weeks respectin the local regulation.

external

Treatment Target

The TPH average concentrations reached 7,500 mg/kg. The treated soil had residual concentrations of 300 mg/kg and could be re-used on the site as filling material.

This project was designed and executed by the current Haemers Technologies team, when they worked within the legal entity L&C SA (formerly Deep Green SA), which belongs to the Haemers Technologies group.

Key Data

Contaminants
TPH

Max. Concentration
7500

Volume
1438

Tonnage
2300

Treatment Targets
<300

Location
Vitry-en-Charollais – France

Future Use
Industrial

Client
Eternit

Date
2004