Paraylemonial – France
During the demolition works of the Eternit factory at Vitry-in-Charollais (71), DG Construction was charged to find efficient solutions to treat the TPH polluted soils found on the site. DG Construction excavated, sorted and handled the polluted material. The depollution was carried out by Deep Green. The project was carried out using a cold configuration DRAGON 35 unit. The duration was a competitive a vantage. So, the project was achieved in two weeks respectin the local regulation. The TPH average concentrations reached...