Ferraris Energis – Milano
The project took place in Italy, in Milan, in front of and behind the existing building on the site. The site is destined to become a parking lot. To access the contaminated area (under the building), a pit (9.7 x 6.6m) was dug, at 3m depth. The treatment began on July 28, 2016 and ended on September 09, 2016, for a period of 43 days. The soil was impacted to a depth of 4.5m by Diesel (C10-C40). Peaks of concentration reached...