Dong – Denmark
The project took place in Denmark, in the city of Alleröd. The site is located in an industrial area, on the grounds of a power station (DONG Energie), under a high voltage transformer. Peak concentrations of chlorinated solvents reached up to 0.38 mg / kg dm, on an area of 36 m2 with a volume of 288 m3. Oil was also detected, with a concentration level up to 15.000mg / kg. The burners were powered by propane. The work was done...