We have started the treatment of our second batch on our site in Bastia, France!

The origin of the contamination is from the old power plant of Lucciana and we are applying In-Situ Thermal Desorption (ISTD) with remote flame to remediate the soil contaminated with COHV (Volatile Organic Halogenated Compounds).

The desired treatment temperature is 85°C and 51 burners are heated to treat 3 200m³ of soil.

We are collaborating with Englobe France on this site remediation.