SITE UPDATE : STRASBOURG, FRANCE
🔝 We have started the treatment of the 4th pile on our site in Strasbourg, France.
✔️ We are applying Ex-Situ Thermal Desorption (ESTD) to remediate the soil contaminated with Hydrocarbons and Polycyclic Aromatic Hydrocarbons (PAHs).
🌡️ The desired treatment temperature is 250°C. 77 burners are heated to treat 2000m³ of soil.
We have introduced a system of continuous monitoring of stack emissions. As soon as we approach the threshold, an alert is triggered, enabling us to take immediate action to resolve the situation. In this way, we are able to guarantee greater compliance with current standards.
🤝 We are working on this project site with Lingenheld Groupe. We bring our strengths together for a common purpose: soil remediation.